Technical, field & production · Data, reporting & decision-making
Know today which week you can promise a new job
Order book, running projects and crew capacity are combined into a rolling 12-week load view; before you accept a job it tells you the realistic start date and warns when a week is overbooked or a crew is sitting idle.
- Avg. time saved
- 3–6 h/week· ≈ 19 h/month
- Rollout
- AdvancedDay 36+
- Who it is for
- Contractors, manufacturers, field ops
In short
Know today which week you can promise a new job: Order book, running projects and crew capacity are combined into a rolling 12-week load view; before you accept a job it tells you the realistic start date and warns when a week is overbooked or a crew is sitting idle. It typically gives back 3–6 hours a week to whoever does this by hand today. Built for: Contractors, manufacturers, field ops.
Typical hours saved per week for the people doing this by hand today, from the 2026 report's ranges. The AI writes what that time makes possible.
Example
Comes in
Sales asks: “Can we take a 3-week roof job starting 6 October?”
The AI
- Checks crew load, running slippages and the two quotes likely to close
Comes back
“Week 41 is at 115%. Realistic start: 20 October, or 6 October if crew B's fence job moves. Which?”
Similar solutions
- Production and stock anomaly guardConsumption rates, scrap and stock levels are watched around the clock; a run-out or a cost spike triggers an alert with the numbers.1–3 h/week
- Weekly production and project report, written for youHours, materials, margins and delays per project every Monday, with a plain-language explanation of what changed.3–5 h/week
- Quoted vs actual: see where your prices leakOn every closed job the AI compares the estimated hours and materials with what was actually used and paid, then shows which job types, crews or line items are consistently under-quoted and suggests the correction.2–4 h/week
- Downtime and scrap causes ranked every weekOperators log a stop or a scrap batch in a few words on a phone; the AI standardises the causes, ranks them by lost hours and cost, and tells the production lead the three things worth fixing first.2–4 h/week
Related terms
Have a process like this? Tell us about it.
Book a call