Technical, field & production · Field, warehouse & production

Plant hours and fuel logged from a photo of the dash

The operator photographs the hour meter and fuel gauge at the end of the shift; the AI reads the values, books the hours to the right project, and moves the next service date forward when the machine has been running harder than planned.

Avg. time saved
13 h/week· ≈ 9 h/month
Rollout
Quick winDays 1–14
Who it is for
Contractors, manufacturers, field ops

In short

Plant hours and fuel logged from a photo of the dash: The operator photographs the hour meter and fuel gauge at the end of the shift; the AI reads the values, books the hours to the right project, and moves the next service date forward when the machine has been running harder than planned. It typically gives back 1–3 hours a week to whoever does this by hand today. Built for: Contractors, manufacturers, field ops.

Typical hours saved per week for the people doing this by hand today, from the 2026 report's ranges. The AI writes what that time makes possible.

Example

Comes in

Photo: excavator hour meter 4,318.6 h, fuel 1/4, site: logistics hall, 17:10

The AI

  1. Reads 8.4 h since the morning photo, books it to the hall project, checks the 500-hour service interval

Comes back

8.4 h on project 2026-031; service due in 31 h, moved to next Tuesday; refuel request sent for the morning

Similar solutions

Related terms

All 267 solutions

Have a process like this? Tell us about it.

Book a call