Rented machines and scaffolding back before the extra week is billed

Every rental contract and delivery note is read on arrival, the return date lands on the site calendar, and the foreman is reminded two days before with a one-tap extend or return; idle rentals still on site get flagged from the progress data.

Avg. time saved
12 h/week· ≈ 6 h/month
Rollout
Quick winDays 1–14
Who it is for
Contractors, manufacturers, field ops

In short

Rented machines and scaffolding back before the extra week is billed: Every rental contract and delivery note is read on arrival, the return date lands on the site calendar, and the foreman is reminded two days before with a one-tap extend or return; idle rentals still on site get flagged from the progress data. It typically gives back 1–2 hours a week to whoever does this by hand today. Built for: Contractors, manufacturers, field ops.

Typical hours saved per week for the people doing this by hand today, from the 2026 report's ranges. The AI writes what that time makes possible.

Example

Comes in

Rental contract: 120 m² facade scaffolding, 3 weeks, from 4 March; mini excavator, 5 days

The AI

  1. Puts both return dates on the site calendar and checks them against the progress board

Comes back

Excavator return reminder on day 3; on 21 March: “Facade done since Tuesday, scaffolding still on site: return or extend?”