Progress invoices drafted when the milestone is done

When the site diary says the slab is poured or the roof is on, the AI drafts the partial invoice from the contract schedule and the accepted quantities, and sends it for approval with the acceptance certificate attached.

Avg. time saved
25 h/week· ≈ 15 h/month
Rollout
CoreDays 15–35
Who it is for
Contractors, manufacturers, field ops

In short

Progress invoices drafted when the milestone is done: When the site diary says the slab is poured or the roof is on, the AI drafts the partial invoice from the contract schedule and the accepted quantities, and sends it for approval with the acceptance certificate attached. It typically gives back 2–5 hours a week to whoever does this by hand today. Built for: Contractors, manufacturers, field ops.

Typical hours saved per week for the people doing this by hand today, from the 2026 report's ranges. The AI writes what that time makes possible.

Example

Comes in

Site diary: “Roof structure complete, accepted by the client's rep on site”

The AI

  1. Matches it to milestone 3 of 5 in the contract (25%), checks previous invoices

Comes back

Draft partial invoice 4,850,000 Ft + VAT with the acceptance certificate; approve and it goes out today